Popular Articles

India likely to grow by 7-7.5% in FY10: Kamath
With greenshoots of economic recovery becoming visible, a top banker was today optimistic that India will record a growth of 7-7.5 per cent in this fiscal. cialis online

payday loans online
Cairn completes 100 days of Mangala production
Mangala (meaning bliss) has lived up to its name for Cairn India. Five years earlier, the company struck black gold at the RJ-ON-90/1 oil block deep inside the stark, unforgiving wilderness of the Rajasthan deserts.

News of the day

UTV signs Rs 95 cr syndication deals
UTV Motion Pictures, an arm of UTV Software Communications, has signed a series of non-exclusive television rights syndication deals amounting to Rs 95 crore. The deals are across their slate of 2008 and 2009 productions, from Oye Lucky! Lucky Oye! and Dev D to recent hits like Kaminey, Wake Up Sid and Kurbaan.
Small Business

Chandrayaan-II to be over by 2012-13: Isro

Chandrayaan-II moon mission, which will help in analysis of mineral composition and undertake terrain mapping of the moon, will be completed by 2012-13, Project Director of Chandrayaan Dr M Annadurai said today. - Chandrayaan-II will be a technical challenge: Mission director - Kalam advises Isro, Nasa on Chandrayaan-II - Now Chandrayaan-II will have Indian rover “The Rs 425 crore project will be completed by 2012-13. As opposed to Chandrayaan-1 which was a moon orbiter, in Chandrayaan-2, the two moon rovers will actually land on the moon surface,” he said inaugurating the sixth National Student Conference at University Visveswaraya College of Engineering. “Chadrayaan-II will consist of the spacecraft and a landing platform with two moon rovers, one from India and one from Russia, which will land on the moon and move on wheels on the lunar surface, pick up samples of soil or rocks, do a chemical analysis and send the data to the spacecraft orbiting above,” Annadurai said. Annadurai, the Project Director of Chandrayaan-I and II, said the Chardrayaan-I, which was the 70th satellite to go on the moon, “created history with discovery of water there (moon)”. “The Rs 386 crore project (Chandrayaan-I) which took four and a half years to be completed has provided 6 terabits of data which will take the scientists three years to mull over,” he said.


Add your comment:
Name:
Site address: http://
Your message:
Enter today\\\\'s date, 2 digits
(spam protection):